Workflows / LEED, BREEAM and Mostadam compared
LEED, BREEAM and Mostadam compared
Three green building rating systems side by side: who runs each one, how credits and levels work, what each weighs most, what each asks the design team to prove, and how a building model supports the evidence.
- Available
- Free account
Three schemes, one aim
LEED, run by the US Green Building Council, BREEAM, run by BRE in the UK, and Mostadam, the Saudi rating system of the Ministry of Municipalities and Housing, each score a building against categories such as energy, water, materials, indoor environment and site, and award a level. They differ in how they weigh the categories, what evidence they accept and who assesses.
How the levels work
- LEED (USGBC): the points a project earns set its level: Certified 40 to 49, Silver 50 to 59, the Gold level 60 to 79, Platinum 80 and more. LEED v5 keeps the four levels, with further requirements for Platinum.
- BREEAM UK New Construction 2018: a percentage score across weighted categories, with ratings from Pass to Outstanding; the benchmarks and the minimum standards for each rating are set in BRE's technical manual.
- Mostadam: points per category with mandatory requirements; the thresholds of each level are set in the current Mostadam manual for the building type.
What they weigh
All three give most weight to energy, then to water, materials and the indoor environment. LEED adds up the points earned credit by credit; BREEAM weights each category's percentage by a factor; Mostadam adapts its categories to the Saudi climate and context, with strong weight on energy and water.
Choosing a scheme
- The client's or the tenant's requirement, often written in the brief.
- The market: BREEAM is common in the UK and Europe, LEED worldwide, Mostadam in Saudi Arabia, where public owners may ask for it.
- Whether the data can be produced: energy models, water calculations, material declarations.
Evidence from the model
Many credits are proved with quantities the building model already holds: areas, glazing, room depths, planting, parking and cycle spaces. Calq gives an indicative score in LEED v4.1 or v5, BREEAM UK New Construction 2018 and Mostadam from what the model holds, lists what it cannot assess (simulations, life cycle assessment, documents), and is never a certification.
Common mistakes
- Choosing the target level after the design is fixed.
- Ignoring a scheme's mandatory requirements, which block a level whatever the score.
- Taking an indicative score for a certification.
Questions
Which is the most demanding?
It depends on the building and the credits pursued; the schemes are not directly equivalent.
Can a building hold more than one?
Yes. Some projects pursue two, at the cost of two sets of evidence and two assessments.
Does a model certify a building?
No. Only the scheme's assessor or certifying body awards a rating; the model provides evidence.
Related
Comments
No comments yet. Sign in to Calq and add the first one.