Workflows / LOD 400 structure: concrete, reinforcement and steel
LOD 400 structure: concrete, reinforcement and steel
The structure from LOD 300 to LOD 400 in one Calq model: foundations, the concrete frame and its reinforcement with BS 8666 shape codes, steel members with their connections, plates, bolts, welds and copes, pours, and the BVBS and DSTV NC files the workshop reads.
- Available
What LOD 400 asks of the structure
For concrete, LOD 400 is the reinforcement: every bar the fixer places, with its shape and its cover, in its host. For steel, it is every part the fabricator makes: the member with its copes and holes, the plates, the bolts and the welds of each connection. For both, the pours and the assemblies the site will build in order.
In Calq all of it lives on the elements of the one structural model. A bar is laid from its host's own geometry, a plate from its member's end, so when the design moves the detailing moves with it.
Before LOD 400: the frame at LOD 300 and 350
- The grid and the levels: the Datums shelf, Grids and levels (set_grid, set_levels)
- The frame on the grid: the Structure and services shelf, Framing, Column, Beam, Brace, Truss, Beam system; or in one step, Calq AI "put a steel frame on the grid with composite floors" (structure_building, create_frame, create_columns, create_beams, create_brace, create_truss, create_beam_system)
- The sections by name: UB, UC, IPE, HEA, HEB, PFC, UPN, angles, tees, hollow sections, plate girders and cold-formed Z and C, tapered and haunched members, precast hollowcore planks, double tees and inverted tees (set_member_section)
- The foundations: Foundations, Footing and Strip footing for pads, strips, pile caps with their piles and piles; ground beams laid with the frame (create_footings, size_footings)
- The floors: slabs with their falls, drains and thickened or upstand edges (create_slabs, set_slab_shape, set_slab_edge); openings trimmed (trim_openings); lintels over every opening that needs one (lay_lintels)
- The load path read storey by storey and the members checked against the loads you give, the connections against EN 1993-1-8 (load_path, check_members, check_structure)
- Openings for the services through walls and slabs at their rough size, made where the runs cross (create_voids, coordinate_model)
Concrete at LOD 400: reinforcement, step by step
- Select a column, a beam, a slab, a wall or a footing and open the Structure and services shelf, Reinforcement and connections, Reinforce. Set the cover and the sets: main bars and links in columns and beams, top and bottom bars both ways in slabs and footings, vertical and horizontal bars on each face of a wall, fabric from A142 to A393.
- Or ask Calq AI: "reinforce every column of level 2 with 8 H25 and H10 links at 200, cover 40" (set_reinforcement). Bars come in metric sizes and ASTM bar numbers, each with its mass per metre.
- Reinforce part of a wall or a slab: an opening's surround, a band, a zone drawn on the face (reinforce_region).
- The bars are laid from the host every time they are read: stretch a beam or make a column taller and its bars follow. Each set carries its BS 8666 shape code and its IFC role, and is drawn in 3D.
- Read the bar schedule: the marks, sizes, shapes, numbers, lengths and masses, by host and by storey (bar_schedule), and send the bars to the bending machine as BVBS (export_exchange, format bvbs).
- Plan the pours: each floor cut into bays along its own grid lines up to the most a pour may be, the ground slab first, then storey by storey the columns and walls before the floor over them (plan_pours, the Pours plan mode). The pours go into the IFC as tasks of a work schedule.
- Read where the structure stands against LOD 350 and 400, element by element and inclusion by inclusion, with the tool that lays what is missing (structure_lod).
- Save the bar bending schedule as an Excel workbook in the layout of BS 8666: member, storey, bar mark, type and size, number, length, shape code, dimensions, mass and grade, the same bar positions as the BVBS file (export_bar_schedule).
- Detail the concrete in one step: a column's bars run on to lap with the column above, a column standing on a footing or a slab takes its starter bars, a wall's bars lap into the wall above and a free wall end is closed with U-bars, beams and slab top bars are hooked, every slab opening takes its trimmer bars, a bar longer than the stock is cut into lapped pieces or joined by couplers, columns and beams take their chamfer, and cast-in plates and lifting inserts are laid where they are called for. Calq AI: "make the structure LOD 400" (detail_structure). Every lap, anchorage and size is a placeholder for the engineer.
- Camber a beam by the rise at mid-span you or your engineer give, in mm: it is written on the beam, on its detail and in the IFC (set_camber). Camber and chamfer are also fields of Properties, Structure.
- On the board, the BBS Excel button saves the same BS 8666 workbook as export_bar_schedule.
Steel at LOD 400: connections and parts, step by step
- Select a member and open Reinforcement and connections, Connect: a base plate with its anchor rods at a column's foot, an end plate or a fin plate at a beam's end, a gusset at a brace's end, a splice along a member. Or ask Calq AI "connect every beam end with fin plates and the column feet with base plates" (set_connection).
- Each connection lays its parts: plates at their thickness, bolts at their diameter and length, fillet welds, stiffeners opposite an end plate on an I or H column, and the copes the beam needs to clear its support.
- Check them: the bolt group, the plate and the weld of each connection against EN 1993-1-8, with the member checks (check_members).
- Mark the structure: each member gets its mark and size on the framing plans (mark_structure).
- Hand the steel to the workshop: the structure package holds the structural IFC, the analysis IFC, an IFC2X3 copy, SAF for analysis and one DSTV NC file per member and plate, holes and copes included (export_structure_package; the Structure and services shelf's hand-off row).
What leaves the model
- IFC with IfcReinforcingBar and IfcReinforcingMesh under their hosts, IfcPlate, IfcMechanicalFastener for bolts and anchor rods, IfcFastener for welds, IfcFooting, IfcPile and the assemblies (export_ifc with structural: true)
- BVBS for the bending machine, DSTV NC for the steel workshop, SAF for the analysis program
- Framing plans with marks and sizes, a framing plan per storey with its member schedule, the foundation plan and the bar schedule
- A takeoff of concrete, steel and reinforcement by storey and section (structure_takeoff)
What stays the engineer's and the detailer's
Calq lays the bars a host calls for and the parts a connection needs, from the rules you give. It never chooses a bar size, a section or a load as a design: every default is a placeholder, said as one in every schedule, for the engineer to set and sign. Check each file in the program that receives it.
Questions
Can Calq produce a bar bending schedule?
Yes. bar_schedule lists every set by host and storey with its mark, size, shape code, number, length and mass, and the bars leave as BVBS for the bending machine.
Does Calq write DSTV NC files?
Yes. The structure package carries one NC file per steel member and plate, with its holes and copes.
Are the bars and plates in the IFC?
Yes. Reinforcement is written as IfcReinforcingBar and IfcReinforcingMesh under its host, connection plates as IfcPlate, bolts and anchor rods as IfcMechanicalFastener and welds as IfcFastener.
What happens to the bars when I change a beam?
They follow. Bars are laid from the host's own geometry and cover each time they are read, so a stretched beam or a taller column carries its reinforcement.