Workflows / LOD 400: modelled for fabrication and installation
LOD 400: modelled for fabrication and installation
LOD 400 step by step: what fabrication, assembly and installation need from a model, trade by trade, and how Calq lays reinforcement, steel parts, fabrication parts and pours from the coordinated model and writes the files the workshop reads.
- Available
What LOD 400 means
At LOD 400 an element is modelled with the detail needed to make it, assemble it and install it. It is the level of shop drawings: when a project's specification asks for shop drawings of something, that something is a candidate for LOD 400. Most models hold few LOD 400 elements, and those are mostly the trades'.
LOD 400 is not a picture with more lines. Each part the workshop makes must be in the model as a part, with its size, its shape, its material and its mark, so that the shop drawing, the cutting list and the machine file are read from the model and agree with it.
What LOD 400 adds, trade by trade
- Concrete: all reinforcement with its shapes, laps and hooks, shear reinforcement, pour joints, chamfers and camber
- Steel: welds, copes, bolts, washers and nuts, bent and cap plates, every part of an assembly
- Masonry: the coursing and the units, the reinforcement and the grout
- Envelope: frame and mullion profiles, fasteners, sealants, flashings and end dams
- Services: the supplementary components for fabrication and installation: the parts a shop cuts, the hanger rods, the fittings
- Site: each component at its true geometry and its position against the finished ground, joints and reinforcement in paving and steps
The order to work in
- Freeze the interfaces first: LOD 400 built on an uncoordinated model is wasted work
- Develop each trade's elements on the coordinated model: reinforcement on its hosts, connections on the members, fabrication parts on the runs
- Read the schedules and the machine files from the model, never typed
- Check what the workshop receives: open each file in the program that will read it
- Issue under ISO 19650 with its status and revision, and keep the model the record of what was made
What Calq lays, and what stays the engineer's or the maker's
Calq does the modelling work: it lays bars from each host's own geometry and cover, parts on each connection, fabrication parts along each run, pours across each floor, and it keeps them attached as the design moves. It never chooses a load, a bar size or a section as a design, and it never chooses a maker's product: every default it lays is a placeholder, said as one, for the engineer or the maker to set.
That keeps the responsibilities where contracts put them while the work stays in one model.
The trade pages
The pages that follow show LOD 400 trade by trade with the real tools: the structure in concrete and steel, the architecture, the services, the site and the landscape, then the federated model and the deliverables that leave the model.
Questions
Does every element need to reach LOD 400?
No. Only the elements a workshop makes from the model, usually the ones the specification asks shop drawings for. The rest stays at LOD 300 or 350.
Can a designer model LOD 400?
Yes, if the team holds the craft knowledge and the contract says so. In Calq the trades can also take the design model to LOD 400 in place, so nothing is redrawn.
Is LOD 400 the same as LOD 500?
No. LOD 400 is what will be made; LOD 500 is what was found or built, by observation, with its accuracy.