Workflows / Model rules, bulk edits and node graphs
Model rules, bulk edits and node graphs
Change a whole BIM model from one sentence: find every element that matches, preview it in colour, then apply. Keep a rule to run again, or wire a node graph, with no code to write.
- Available
What it is
A rule is one sentence that changes a model: find these, change that. Find is a kind of element, a storey and conditions on any field its schedule can show. Change is any field a schedule cell may be typed in.
The rule is worked out by one engine that reads the same schedule you see and writes through the same write-back, so a rule can do exactly what a careful hand in a schedule can do, across the whole project, as one undoable step.
How a rule goes
- Open Project, then Rules, and build the sentence from the lists: the kind, the storey, the conditions
- See what it finds: the matching elements are coloured in the views, without touching your selection
- Say what to change, and read the preview of what each element would become
- Apply: every change lands as one step, and a value that is refused says its reason
- Keep the rule on your shelf, the project's or the office's, to run again on this model or another
Types are kept
Where a size is set by an element's type, a rule never breaks the type to force a number. It moves the elements to the type that has that size, and makes one from their own when none has it. Nothing leaves its type, so the schedules and the IFC stay clean.
A rule reaches only what was asked. A storey or a field the model does not hold is a refusal, never every storey or another field.
Node graphs: visual scripts
For a job that needs steps, open Project, then Node graphs. A graph is boxes wired together: take these elements, read this, work that out, write it back. It runs in the browser, shows what each node found, and lands as one change you can undo.
- Starter graphs to open and change: doors by storey, the sills of a facade, columns on a grid
- Nodes that know the building: which walls face outside, where the grid lines cross, what is selected
- Graphs kept with the model, and Calq AI can write and run one for you
Who it is for
The BIM manager who has to bring a model to a standard, the architect who changes a decision late and the engineer who needs the same edit on every storey. One rule replaces a day of selecting and typing.
Good to know
Writing a rule and seeing what it finds are on the free account. Applying a rule to the model is part of Professional's project automation; what each plan holds is on calq.live/pricing. Editing one cell at a time in a schedule stays free.
A measured field, such as a length or an area, cannot be set by a rule: the model is what is measured.
Questions
How do I change many elements at once in a BIM model?
In Calq, write a rule: choose the kind of element, the storey and the conditions, see the matches coloured in the views, say what to change and apply it as one undoable step.
Do I need to know programming?
No. A rule is a sentence built from lists, and a node graph is boxes wired together. Neither asks for code.
Does Calq have visual scripting?
Yes. Node graphs, under Project, wire nodes into a script that runs in the browser on the model, shows what each node found and lands as one change.
Can I undo a rule?
Yes. Whatever a rule changes lands as one step, and one undo takes all of it back.
Can I reuse a rule on another project?
Yes. A kept rule sits on your shelf, the project's or the office's, with blanks to fill when you run it again.
Is applying a rule free?
Writing a rule and seeing what it finds are free. Applying it is on Professional; calq.live/pricing says what each plan holds.