Three kinds of joint, three jobs

A construction joint is where one pour stops and the next begins. It is not meant to move: the two pours must act as one, so the joint carries shear through the reinforcement that crosses it, its roughened surface and, where needed, a keyway. A movement joint lets the structure expand, shrink or settle without cracking where nobody wants it, and is detailed to open and close. An isolation joint separates elements that must move independently, such as a ground slab from a column or a wall.

Mixing them up is the most common error on drawings: a movement joint drawn with continuous bars cannot move, and a construction joint left without bars across it becomes a crack.

Where a construction joint belongs

Preparing and reinforcing the joint

Movement and isolation joints

Movement joints are set by the engineer from the element's length, its restraint, the climate and the shrinkage of the concrete. They break the reinforcement, or carry the load across it on a dowel that slides in a sleeve, are sealed with a sealant over a backer rod, and run through every layer above: a floor finish or a facade laid across a structural joint will crack along it.

Saw-cut contraction joints in a ground slab are cut as soon as the concrete takes the blade without ravelling, to the depth the slab's design sets; cut late, the slab cracks first.

Common mistakes

Joints as part of the model

When joints are elements of the model rather than lines on a plan, the pour plan, the slab layout, the waterproofing and the finishes all read the same joint. In Calq the construction joints follow the pours of the pour plan with their bars, keyways and waterstops, and go to the IFC with the rest of the structure.

Questions

Is a construction joint a weak point?

Not when it sits where the shear is low, is roughened and cleaned, and is crossed by the designed reinforcement: it then works with the rest of the element. It becomes one when it is placed where the engineer did not plan it, or left smooth.

Can the contractor move a construction joint?

Only with the designer's agreement. A joint changes how shear and shrinkage act, so its position is part of the design.

Do movement joints carry bars?

They are detailed so the element can move: the bars stop at the joint, or a dowel in a sleeve carries load across while letting the element slide.

Related