Workflows / Linked models and BIM coordination
Linked models and BIM coordination
Link another model or an IFC file into a Calq model, see it in every view, check it for clashes, and read one coordination report across architecture, structure and services, with issues that leave as BCF.
- Available
What it is
Coordination in Calq has two parts. A linked model is another discipline's model placed in yours: drawn in every view, never copied into your file. The coordination reading checks the disciplines of a model against each other and says what clashes, where, and what mends it.
Both read the model through the same engines that draw it, so what the report says is what the views show.
Linked models
- Link another model of your account, or an IFC file brought in as a model of its own
- Place it origin to origin, by shared coordinates through the survey point and the grid, or by hand with a move and a turn
- It is drawn in every view in its own pen; its elements are picked read only, with their properties
- Hide it or halftone it view by view
- When its source changes the link is marked out of date and reloads
- A linked model is a pointer and a placement: its elements are never saved into the host model
The coordination report
One report reads every discipline against every other, storey by storey, ranked with the hard clashes first. Each item names the elements, the place and the tool that mends it.
- Structure against architecture
- Services against structure: beams, columns and slabs
- Services against the walls and the voids
- Services against each other, by a clearance and by the order of who moves first
- Each discipline's own gaps: an open end of a run, a column on no footing
- The services zone of every storey: the void each ceiling leaves and the deepest run in it
Coordinating in one step
The coordination run clears what can be cleared safely in one undo step: the structure's safe fixes, the services cleared of the structure and of the voids, and the services cleared of each other by the coordination priority, in which the run that can move least stays. It reads the model again until a pass mends nothing, then says what is left, by discipline.
What is left becomes issues on the model, and the issues leave as BCF 2.1 or 3.0 for any other tool.
Good to know
The clearance between services is the project's own figure, from its BIM execution plan: until you give one, Calq uses a placeholder and says so wherever it is used.
The model check and the BCF export are on the free account. Linking models and coordinating across them are part of Studio; what each plan holds is on calq.live/pricing. Bringing an IFC in is Beta: check what comes in. The report and the coordination run are tools of Calq AI, on the paid plans, and of any AI assistant connected to your account.
Questions
Can I link an IFC file into a Calq model?
Yes. The IFC is brought in as a model of its own (Beta) and linked: it is drawn in every view in its own pen and never saved into your model.
Does Calq detect clashes?
Yes. Calq checks structure against architecture, services against structure, walls and voids, and services against each other, and checks a linked model against the host.
Can Calq fix clashes automatically?
Yes, the ones that are safe to fix: the coordination run moves services clear of the structure and of each other in one undo step and says what is left for a person to decide.
How do I place a linked model in the right position?
Origin to origin, by shared coordinates through each model's survey point and grid, or by hand with a move and a turn.
Can I send clashes to another tool?
Yes. Clashes become issues on the model and are exported as BCF 2.1 or 3.0, with viewpoints that select the same elements in any BCF tool.