Workflows / Smoke filling and escape time: ASET and RSET explained
Smoke filling and escape time: ASET and RSET explained
How a fire engineer compares the time available to escape with the time escape needs: how smoke fills a room or a storey, the smoke layer and tenability limits, detection, pre-movement, travel and queuing, and how the building model supports the calculation.
- Available
- Free account
The comparison at the heart of fire engineering
A performance-based escape design compares two times. ASET, the available safe escape time, runs from ignition until the conditions where people are become untenable: the smoke layer comes down to head height, or heat, toxic gases or loss of visibility pass their limits. RSET, the required safe escape time, runs from ignition until everyone has left: detection, alarm, pre-movement and movement. The design holds when ASET exceeds RSET with a margin. In the UK the method is set out in BS 7974 and its published documents, PD 7974-6 for evacuation.
How smoke fills a space
- The fire's plume draws in air as it rises, so the mass of smoke grows with height; the smoke gathers under the ceiling as a hot layer that deepens over time.
- Zone models treat a room as a hot upper layer and a cool lower layer, and work out how fast the interface comes down from the fire's growth, the room's area and height and its openings.
- In connected spaces, an atrium or a storey of open rooms, the smoke spreads through the openings and fills the connected volume together.
- Height buys time: the same fire takes longer to bring a high ceiling's smoke layer down to head height.
Tenability
Tenability limits are set by the fire engineer: commonly a clear height of smoke-free air above head height, a limit on the layer's temperature and on radiant heat, and limits on visibility and toxic gases. They are design choices stated in the fire strategy, not universal constants.
The time escape needs
- Detection and alarm: the time a detector takes to respond and the alarm to sound.
- Pre-movement: the time people take to recognise the alarm and decide to leave, often the longest part, and the one that depends most on the building's use and management.
- Movement: walking the travel distance and passing doors and stairs, where flow rates create queues.
Using the building model
Areas, heights, openings, travel distances and door widths are read from the model instead of being measured again for each option, so a change to the plan updates the calculation. Calq estimates smoke filling for a room, for a connected storey and for the spread of a fire, and states its assumptions; the fire strategy and its acceptance remain the fire engineer's.
Common mistakes
- A design fire whose growth rate was not justified.
- Pre-movement time left out.
- An atrium treated apart from the storeys open to it.
- A calculation used in place of the code's prescriptive route without the authority's agreement.
Questions
Is ASET greater than RSET enough?
A safety margin is added, the inputs are tested for sensitivity, and the authority having jurisdiction agrees the approach.
What is a zone model?
A simplified model that treats each room as a hot upper layer and a cool lower layer. It is fast and suits early design; complex geometries call for computational fluid dynamics.
Who signs off a performance-based escape design?
The fire engineer who prepared it, and the authority having jurisdiction that accepts it; a calculation tool supports them but does not replace them.
Related
Comments
No comments yet. Sign in to Calq and add the first one.