Workflows / LOD 200: generic elements at approximate size
LOD 200: generic elements at approximate size
LOD 200 step by step: generic placeholders you recognise as walls, floors, beams, ducts and pumps, at an approximate size, place and count, and how Calq lays them inside the chosen massing for schematic design.
- Available
- Free account
What LOD 200 means
At LOD 200 an element is a generic 3D placeholder that is recognisably what it is: a wall, a slab, a beam, an air handling unit, a light. Its size, its place, its shape and how many there are are approximate. You can read the scheme from it, but any figure taken from it is still an estimate.
This is schematic design: the rooms in their place, the structure's rhythm, the routes the services will take, the envelope's proportions. LOD 200 is also the level most furniture, equipment and specialties stay at until a maker is chosen.
What each trade looks like at LOD 200
- Architecture: walls with a generic thickness, floors, roofs, stairs and cores in their place, rooms with their areas, openings as generic doors and windows
- Structure: a grid with columns and beams at an assumed size, slabs at an assumed depth, foundations by type
- Services: the main routes as generic ducts and pipes, plant as boxes at an assumed size, risers in their shafts
- Site: the building on the ground, paths and parking as areas, the ground surface from the survey or the map
Build it in Calq, step by step
- Lay the building in the chosen masses: Calq AI "lay out the rooms in option B" (build_from_brief with the option, or plan_building for one building). The engines lay walls, rooms, doors, cores and stairs inside the masses as you left them.
- Or draw by hand: the tool palette's Walls and openings, Floors, roofs and stairs, and Rooms and areas shelves. Generic types are fine at this stage: a wall knows its height and thickness, a room its area.
- Lay the structure's rhythm: the Datums shelf, Grids and levels (set_grid), then the Structure and services shelf, Framing, for a frame on the grid. Calq AI: "put a concrete frame on the grid, with pads under the columns" (structure_building).
- Reserve the services: plant rooms, risers and ceiling voids as rooms and zones, the main runs as generic ducts and pipes (route_services).
- Close the building: finish_building lays the missing floors and roofs so every room is enclosed, and says what it did.
Check it before you go further
- The brief: every room linked to its line, measured by the brief's own rule (get_programme)
- The plot: setbacks, height, coverage and floor area ratio against the rules given (check_plot_rules)
- The model's own faults: rooms without doors, walls that do not meet, stairs without a well (check_model)
- A first look: view_model shows Calq AI the plan as you see it, with its measured faults
Moving to LOD 300
Give each generic element its real type: a wall its build-up, a beam its section, a duct its size and system. In Calq the element keeps its id, its place and its hosted openings when its type changes, so every drawing and schedule follows. The next page shows how.
Questions
Is a generic wall LOD 200 even if it is drawn at the right thickness?
Yes, while its build-up and its thickness are still assumptions. It becomes LOD 300 when the team commits to its type and it can be measured as designed.
Can Calq lay a whole scheme at LOD 200?
Yes. From a chosen massing, Calq AI and the engines lay rooms, walls, doors, cores, stairs, floors and roofs in one request, and every element can be changed by hand afterwards.
What should stay at LOD 200 for a long time?
Elements whose maker is not chosen yet: furniture, equipment, specialties. They stay generic until the choice is made, then are swapped for the real component.