Workflows / Saudi Building Code check on the BIM model
Saudi Building Code check on the BIM model
Calq reads the Saudi Building Code as data and checks a BIM model against it by occupancy group: persons, exits, egress width, sprinklers, fixtures, building height and area, with every figure tied to its SBC section, and the Balady permit set from the same model.
- Available
What it is
Calq holds the Saudi Building Code as a data file: the rules of SBC 201 with the section each comes from, laid by occupancy group. Set the Saudi code on a model and the model is checked against it while you design, in Arabic or in English.
Calq is made in Madinah. The check, the plot rules of the Ministry, the Arabic sheets and the Balady upload slots are parts of one platform, read from one model.
How it goes
- Set the building code of the model to the Saudi Building Code
- Choose the occupancy group, or let Calq read it from the brief's building type and the rooms
- Say whether the building is sprinklered, has a fire alarm and standpipes, and its type of construction
- Read the check in the Code panel: each rule with its SBC section, what passed, what failed and what was not measured
- See each fault where it is, on the plan and in 3D, and fix the model
What is checked
- The occupancy group of the building, and the persons each room holds from the code's own table
- Ways out: the rooms and storeys that need two, the walk to a single door, the width the persons need, the ways out left when one is lost
- Doors, stairs and ramps by their sizes, heights and swings
- Where the code asks for sprinklers, a fire alarm or standpipes, against what the model says it has
- Sanitary fixtures against the persons, and a wall's openings by its distance to the plot line
- The building's height, storeys above grade and area by its type of construction
- Accessibility as SBC 201 chapter 11 prints it: the route to every storey, the lift, accessible parking and the family toilet
Where every figure comes from
The 2024 Arabic volumes state each rule in words and send most figures to the English text. Calq says so on every clause: a figure reads as its 2024 section with the figure of the 2018 text, and the figures the 2024 text prints itself are marked as read there, with their Arabic words.
Every numbered section and table of the SBC volumes Calq has read is a row of a ledger. What Calq does with each row, measured on the model, held as a figure, or read only, is worked out from the live data, and the Code panel, Calq AI and connected assistants can read that coverage volume by volume.
The permit, from the same model
The Ministry's published residential rules are held as a named rule set and applied to a plot only when you name it. The plot check measures coverage, setbacks, height and parking on the building as designed.
For a building permit on Balady, Calq gives the values the form asks for under the platform's own Arabic labels, and prints the set one PDF per upload slot: the architectural drawing, the general site plan, the tables with elevations and sections, the facade image and the energy efficiency page. Sheets in Arabic are lettered right to left with the Saudi title block.
Good to know
It is a pre-check, never a certificate: the municipality and the authority decide. A rule that is not held, or not measured on the model, is never counted as a pass. The technical sizes the code takes from a referenced standard are held only where the code prints them.
Choosing the code, the occupancy group and reading the figures are on every plan, Free included. The check on the model, the plot check and the permit set are part of Studio: calq.live/pricing says what it holds.
Questions
Is there software that checks a model against the Saudi Building Code?
Yes. Calq checks a BIM model against the Saudi Building Code in the browser: occupancy, persons, exits, egress width, sprinklers, fixtures and the building's height and area, each rule with its SBC section.
Which edition of the SBC does Calq use?
The 2024 edition's sections. Where the 2024 Arabic text sends a figure to the English text, Calq uses the figure of the 2018 text and says so on the clause.
Can Calq prepare the drawings for a Balady building permit?
Yes. Calq prints the permit set from the model, one PDF per Balady upload slot, with the site plan to scale, the area and setback tables and the form's values in Arabic. It is a set to review before you submit.
Does Calq work in Arabic?
Yes. The interface is in Arabic, right to left, and a model in Arabic prints its sheets, schedules and reports in Arabic with the Saudi title block.
Is the SBC check a certificate of compliance?
No. It is a pre-check for the design office. The authority reviews and decides.
Can I read the Saudi Building Code figures for free?
Yes. Reading the code's figures with their sections is on the free account. Checking the model against them is part of Studio.